标准列表
标准号 | 标题 | 发布日期 | 页数 |
CEN EN 12953-4 | Shell Boilers - Part 4: Workmanship and Construction of Pressure Parts of the Boiler | 2002.05.20 | 48pages |
CEN EN 13290-2 | Space Project Management - General Requirements - Part 2: Project Breakdown Structure | 2001.05.01 | 16pages |
CEN EN 13136 | Refrigerating Systems and Heat Pumps - Pressure Relief Devices and Their Associated Piping - Methods for Calculation - Includes Amendment A1: 2005 | 2001.05.01 | 28pages |
CEN EN 12953-3 | Shell Boilers - Part 3: Design and Calculation for Pressure Parts | 2002.05.20 | 94pages |
CEN EN 13530-1 | Cryogenic Vessels - Large Transportable Vacuum Insulated Vessels - Part 1: Fundamental Requirements | 2002.05.22 | 18pages |
CEN EN 12853 | Food processing machinery - Hand-held blenders and whisks - Safety and hygiene requirements - Incorporates Amendment A1: 2010 | 2001.05.01 | 34pages |
CEN EN 13024-1 | Glass in Building - Thermally Toughened Borosilicate Safety Glass - Part 1: Definition and Description | 2002.05.24 | 30pages |
CEN EN 13150 | Workbenches for Laboratories - Dimensions, Safety Requirements amd Test Methods | 2001.05.01 | 22pages |
CEN EN 13139 | Aggregates for mortar | 2002.05.24 | 37pages |
CEN EN 88/PRA2 | Pressure Governors for Gas Appliances for Inlet Pressures up to 200 mbar | 2001.05.01 | 7pages |
CEN EN 1850-2 | Flexible Sheets for Waterproofing - Determination of Visible Defects - Part 2: Plastic and Rubber Sheets for Roof Waterproofing | 2001.05.01 | 7pages |
CEN EN 13139 | Aggregates for mortar - Incorporating corrigendum May 2004 | 2002.05.24 | 38pages |
CEN EN 13290-4 | Space Project Management - General Requirements - Part 4: Project Phasing and Planning | 2001.05.01 | 33pages |
CEN EN 13641 | Elimination or Reduction of Risk of Infection Related to In Vitro Diagnostic Reagents | 2002.05.27 | 12pages |
CEN EN 13290-5 | Space Project Management - General Requirements - Part 5: Configuration Management | 2001.05.01 | 24pages |